Nail the starter strip to the siding aligning the top of the strip with the chalk line.
Placing shaker siding at top of peak.
Put the bottom step flashing on the starter course then bend the bottom of the step flashing out about 1 to 1 away from the wall.
When you replace the boards use a homemade reveal set jig to match the reveal of the existing siding.
One of the reasons that shake siding is so popular is the way that it can give your home a rustic or retreat style r look.
Start at the bottom of the wall at one end.
Pop a level chalk line for the starter strip an inch or two above the bottom of the siding.
Above the bottom edge.
Attach the aluminum attachments to the uppermost edge of the top piece of siding using the crimping tool.
You do have to trim the top starter course shingle with a triangle shaped cut to allow this.
Push up gently until you hear a click.
It should move smoothly.
Installing vinyl shake siding.
Align one of the vertical edges at the edge of the trim or.
Affix attachments every 6 8 inches to allow the siding to be flexible enough to expand and contract with heating changes.
These classic vinyl siding colors deliver curb appeal for years boost your home s curb appeal with one of these gorgeous vinyl siding hues from classic neutrals to trendy bold.
Be sure the top and bottom click into place.
Shake siding design ideas.
The courses should overlap by at least 1 in.
Nail vertical vinyl corners to the corners of the house making sure they are plumb.
Push the top of the vinyl siding with the tabs into the utility trim just enough to hold the edge and push the bottom against the second to last piece of siding.
On a wall to be covered with wood cement board vinyl or metal siding the step flashing and associated roofing must be installed first so the siding can cover the top of the step flashing on.
Start your siding at those points doing 3 4 rows at a time and use the level reference line to keep you straight.
Once it is in place test by sliding the last piece back and forth slightly.
Ok no problem simply still create a level line that is higher than the peak of the garage roof decide where you want the siding to start and measure down from the level line equal distances at the back and front of garage roof.
Replace siding by working from the bottom up you might need a helper here.
The top of the step flashing is still under the siding or plaster.